Ash Handling Plant Jobs

1 to 8 of 8 vacancies

Sort by:  Date | Relevance

Operator - Utility  

SDP HR Solution - Bharuch

operations and maintenance of ESP, Wet Scrubber, Coal and Ash handling Plant system etc. d) Shall have hands on experience of maintenance of Boiler and its accessories like pumps, valves, Safety Valves SH 1.00 LPA To 3.00 LPA INR

from: jobitus.com - More than 30 days ago

BOILER OPERATOR (DCS) - 16MW POWER PLANT - TILDA  

VINAYAK JOB CONSULTANT

control, and ash handling, to comply with environmental regulations and minimize environmental impact.Perform routine maintenance tasks, inspections, and lubrication activities on boiler equipment to ensure 2.00 LPA To 3.00 LPA INR

from: jobitus.com - 26 days ago

MANAGER POWER GENERATION  

SAHYOG RECRUITMENT AGENCY - Bareilly,Gorakhpur,Jaipur,Noida,Kanpur,Lucknow,Kolkata,Gurugram,Pune

of medium size power plant main & auxiliary equipment, viz. boiler, TG set, cooling water system, ID fan, FD fan, PA fan, DM plant, coal handling & ash handling system, ESP and other related auxiliary system

from: Shine.com - 23 days ago

BOILER OPERATOR (2ND CLASS) - 16MW POWER PLANT - TILDA  

VINAYAK JOB CONSULTANT

control, and ash handling, to comply with environmental regulations and minimize environmental impact.Perform routine maintenance tasks, inspections, and lubrication activities on boiler equipment to ensure 2.00 LPA To 3.00 LPA INR

from: jobitus.com - More than 30 days ago

PF Instrument (Shift Oprtn) @ Patna  

Aditya Birla Group - India

to silo feeding,Hopper extraction ,Hopper feeding from stacker reclaimer and wagon shift operation of Ball Mill RP Circuit, Both Slag Mills, Complete VRM Circuit, Utility and Fly Ash Handling, Packing Plant Not Mentioned

from: Monsterindia.com - 5 days ago

Process Manager  

ADSD CONSULTING PVT. LTD. - Noida, India

Projects, Soda Ash Projects, Sulphur Handling and Sulphuric Acid Projects. Should be capable of process design concepts development, sizing calculation, developing of flow sheets and instrument diagrams Not Mentioned

from: Monsterindia.com - 18 days ago

PF TPP (Operation-Shift Ic)  

UltraTech Cement Limited - Wardha

and associated equipments. The lime stone & ash handling system is of pneumatic type. The water treatment system consists of R O & D M plant. Wast water will be treated in waste water treatment plant. Auxiliary Not Mentioned

from: Monsterindia.com - More than 30 days ago

PF TPP (Operation- Desk Engr)  

UltraTech Cement Limited - Wardha

of Deaerator system etc. The design fuel for boiler is lignite. The approximate fuel consumption would be 900T/Day considering full load running of all two turbines. The fuel handling plant comprises of two Not Mentioned

from: Monsterindia.com - More than 30 days ago


Get email alerts for: Ash Handling Plant Jobs

Top locations

Loading map...

Top locations in India hiring now Ash Handling Plant Jobs:

Login through

JobisJob Tutorial

Visit our Help Centre

JobisJob Forum

Start a Discussion and Share your Insights.

Join

Share Options

Filter jobs by

Related sections

My recent searches
You have no recent searches at the moment.
Use our Job Search to find your new job.

Refine your search

My recent searches
Ash Handling Plant