Power Plant Jobs in Raipur
VINAYAK JOB CONSULTANT - Raipur
instrumentsTake readings from charts, meters, and gauges at established intervals Monitor and inspect power plant equipment and indicators to detectevidence of operating problems.Make adjustments or minor repairs 1.80 LPA To 3.00 LPA INR
from: jobitus.com - Yesterday
VINAYAK JOB CONSULTANT - Raipur
experience 2) Should have Knowledge of programming in laser machine 3) Should Know maintenance of the machinePreferred Industrial background TMT,STEEL,POWER PLANT,ROLLING MILL,SPONGE IRON INDUSTRIES Contact 4.20 LPA To 4.80 LPA INR
from: jobitus.com - 13 days ago
Global Placement Services - Raipur
-on experience in AFBC/CFBC Boiler (with minimum working pressure of 40kg/cm2 minimum capacity of 40 TPH) and Turbine Operation.Power plant details : 2- 66 TPH AFBC Boiler & 25 MW Turbine, working Pressure - 63 Kg
from: engineeristic.com - More than 30 days ago
VINAYAK JOB CONSULTANT - Raipur
pusher during break periods. JOB APPLY http://jobs.vinayakjob.com/CONTACT - RAKESH SINHA - 9039007336 Designation: TURBINE OPERATOR (DCS) - 16MW POWER PLANT - TILDA Vacancies: 2 Experience: 2.0 Year(s 1.80 LPA To 3.00 LPA INR
from: jobitus.com - 27 days ago
VINAYAK JOB CONSULTANT - Raipur
, including materials used and hours worked.Requirements:Proven experience as a Welder in an industrial setting, preferably in a sponge iron power plant or similar heavy industry.Proficiency in various welding 2.40 LPA To 3.00 LPA INR
from: jobitus.com - More than 30 days ago
Real Ispat & Power - Raipur
Participate in shift turnover meetings to communicate relevant information,including equipment status,ongoing activities,and any issues or concerns . Not disclosed INR
from: naukri.com - 11 days ago
VINAYAK JOB CONSULTANT - Raipur
Urgent Requirement of Instrument TECHNICIAN for Power Plant at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults 2.60 LPA To 3.60 LPA INR
from: jobitus.com - 24 days ago
VINAYAK JOB CONSULTANT - Raipur
of preventive maintenance plans to enhance equipment reliability and longevity.Requirements:Proven experience as a Fitter or similar role in an industrial setting, preferably in a sponge iron power plant 2.00 LPA To 2.40 LPA INR
from: jobitus.com - More than 30 days ago
Vandana Global (VGL) - Raipur
Responsible for the overall electrical and instrument (E&I) maintenance of the Power Plant (PP) unit,including but not limited to planning,scheduling,execution,and documentation of all maintenance 1.25-2 Lacs PA INR
from: naukri.com - 26 days ago
VINAYAK JOB CONSULTANT - Raipur
of preventive maintenance plans to enhance equipment reliability and longevity.Requirements:Proven experience as a Fitter or similar role in an industrial setting, preferably in a sponge iron power plant 2.40 LPA To 3.00 LPA INR
from: jobitus.com - More than 30 days ago
Get email alerts for: Power Plant Jobs in Raipur
Sponsored Ads by Indeed