8 Ash Handling Plant Jobs
-
Manager - ASH Design BTL EPC Ltd. - Kolkata (Calcutta), India BTL EPC Ltd. Engineering a better tomorrow Grow With Us BTL EPC Ltd is one of the fastest growing diversified company specializing in EPC projects in the area of Bulk Material Handling, Ash, Coal Yesterday
-
Senior Manager/ Manager (Proposal Engineering) BTL EPC Ltd. - Kolkata (Calcutta), India BTL EPC Ltd. Engineering a better tomorrow Grow With Us BTL EPC Ltd is one of the fastest growing diversified company specializing in EPC projects in the area of Bulk Material Handling, Ash, Coal Yesterday
-
Operator - Utility SDP HR Solution - Bharuch operations and maintenance of ESP, Wet Scrubber, Coal and Ash handling Plant system etc. d) Shall have hands on experience of maintenance of Boiler and its accessories like pumps, valves, Safety Valves SH 1.00 LPA To 3.00 LPA INR More than 30 days ago
-
Senior Manager/ Manager (Estimation Engineering) BTL EPC Ltd. - Kolkata (Calcutta), India BTL EPC Ltd. Engineering a better tomorrow Grow With Us BTL EPC Ltd is one of the fastest growing diversified company specializing in EPC projects in the area of Bulk Material Handling, Ash, Coal Yesterday
- Forum: Start a Discussion Join
-
BOILER OPERATOR (2ND CLASS) - 16MW POWER PLANT - TILDA VINAYAK JOB CONSULTANT control, and ash handling, to comply with environmental regulations and minimize environmental impact.Perform routine maintenance tasks, inspections, and lubrication activities on boiler equipment to ensure 2.00 LPA To 3.00 LPA INR More than 30 days ago
-
BOILER OPERATOR (DCS) - 16MW POWER PLANT - TILDA VINAYAK JOB CONSULTANT control, and ash handling, to comply with environmental regulations and minimize environmental impact.Perform routine maintenance tasks, inspections, and lubrication activities on boiler equipment to ensure 2.00 LPA To 3.00 LPA INR More than 30 days ago
-
PF TPP (Operation-Shift Ic) UltraTech Cement Limited - Wardha and associated equipments. The lime stone & ash handling system is of pneumatic type. The water treatment system consists of R O & D M plant. Wast water will be treated in waste water treatment plant. Auxiliary Not Mentioned More than 30 days ago
-
PF TPP (Operation- Desk Engr) UltraTech Cement Limited - Wardha of Deaerator system etc. The design fuel for boiler is lignite. The approximate fuel consumption would be 900T/Day considering full load running of all two turbines. The fuel handling plant comprises of two Not Mentioned More than 30 days ago
Top locations