11 Power Plant Jobs in Raipur
-
TURBINE FIELD ENGINEER - 16MW POWER PLANT - TILDA VINAYAK JOB CONSULTANT - Raipur instrumentsTake readings from charts, meters, and gauges at established intervals Monitor and inspect power plant equipment and indicators to detectevidence of operating problems.Make adjustments or minor repairs 1.80 LPA To 3.00 LPA INR 4 days ago
-
Sr. Engineer (Laser Cutting Machine) - Raipur VINAYAK JOB CONSULTANT - Raipur experience 2) Should have Knowledge of programming in laser machine 3) Should Know maintenance of the machinePreferred Industrial background TMT,STEEL,POWER PLANT,ROLLING MILL,SPONGE IRON INDUSTRIES Contact 6.00 LPA To 10.00 LPA INR 16 days ago
-
DCS Engineer/Operator - Boiler (6-8 yrs) Raipur (Electrical/Mechanical) Global Placement Services - Raipur -on experience in AFBC/CFBC Boiler (with minimum working pressure of 40kg/cm2 minimum capacity of 40 TPH) and Turbine Operation.Power plant details : 2- 66 TPH AFBC Boiler & 25 MW Turbine, working Pressure - 63 Kg More than 30 days ago
-
TURBINE OPERATOR (DCS) - 16MW POWER PLANT - TILDA VINAYAK JOB CONSULTANT - Raipur pusher during break periods. JOB APPLY http://jobs.vinayakjob.com/CONTACT - RAKESH SINHA - 9039007336 Designation: TURBINE OPERATOR (DCS) - 16MW POWER PLANT - TILDA Vacancies: 2 Experience: 2.0 Year(s 1.80 LPA To 3.00 LPA INR 30 days ago
- Forum: Start a Discussion Join
-
WELDER - RAIPUR VINAYAK JOB CONSULTANT - Raipur , including materials used and hours worked.Requirements:Proven experience as a Welder in an industrial setting, preferably in a sponge iron power plant or similar heavy industry.Proficiency in various welding 2.40 LPA To 3.00 LPA INR More than 30 days ago
-
DESK ENGINEER - POWER PLANT Real Ispat & Power - Raipur Participate in shift turnover meetings to communicate relevant information,including equipment status,ongoing activities,and any issues or concerns . Not disclosed INR 14 days ago
-
INSTRUMENT TECHNICIAN - TILDA, RAIPUR VINAYAK JOB CONSULTANT - Raipur Urgent Requirement of Instrument TECHNICIAN for Power Plant at Raipur Location. Fitting new parts. Carrying out quality inspections. Responding immediately to equipment breakdowns. Fixing faults 2.60 LPA To 3.60 LPA INR 27 days ago
-
FITTER ( MECHANICAL) - RAIPUR VINAYAK JOB CONSULTANT - Raipur of preventive maintenance plans to enhance equipment reliability and longevity.Requirements:Proven experience as a Fitter or similar role in an industrial setting, preferably in a sponge iron power plant 2.00 LPA To 2.40 LPA INR More than 30 days ago
-
AGM/DGM/E&I/ - Power plant Vandana Global (VGL) - Raipur Responsible for the overall electrical and instrument (E&I) maintenance of the Power Plant (PP) unit,including but not limited to planning,scheduling,execution,and documentation of all maintenance 1.25-2 Lacs PA INR 29 days ago
-
FITTER - RAIPUR VINAYAK JOB CONSULTANT - Raipur of preventive maintenance plans to enhance equipment reliability and longevity.Requirements:Proven experience as a Fitter or similar role in an industrial setting, preferably in a sponge iron power plant 2.40 LPA To 3.00 LPA INR More than 30 days ago
Top locations