2 Boiler Design Jobs in Wardha
-
PF TPP (Operation-Shift Ic) UltraTech Cement Limited - Wardha for 2 units having dia. Of fan-9.5 Mtrs, Steam jet air ejectors, gland steam condensers, 02 Nos of Deaerator system etc. The design fuel for boiler is lignite. The approximate fuel consumption Not Mentioned More than 30 days ago
-
PF TPP (Operation- Desk Engr) UltraTech Cement Limited - Wardha of Deaerator system etc. The design fuel for boiler is lignite. The approximate fuel consumption would be 900T/Day considering full load running of all two turbines. The fuel handling plant comprises of two Not Mentioned More than 30 days ago
Top locations
- Bangalore (11)
- Chennai (9)
- Pune (6)
- Ahmedabad (5)
- Secunderabad (5)
- Mumbai (4)
- Hyderabad (3)
- Bharuch (2)
- See more