5 Power Plant Jobs in Wardha
-
PF TPP (Operation-Shift Ic) UltraTech Cement Limited - Wardha generation and co-ordination other agencies in the plant. Job Context & Major Challenges : Thermal power plant consists of 1x35 MW and 1x22.5 MW total capacity 57.5MW, condensing type steam turbine with three Not Mentioned More than 30 days ago
-
PF TPP (Operation- Desk Engr) UltraTech Cement Limited - Wardha - shutdown of boiler and turbine along with economic, uninterrupted and quality power generation by co-ordination with other agencies in the plant to rectify the abnormalities and report to Shift Incharge Not Mentioned More than 30 days ago
-
PF Process ( CRO Raw Mill) UltraTech Cement Limited - Wardha running of plant and ensure to handling Raw material & coal feeding system by optimisation of process parameters, to meet the production, power and quality targets at optimum cost maintaining environment Not Mentioned More than 30 days ago
-
PF Tech Services (Mech-Project) UltraTech Cement Limited - Wardha : Sewagram Cement Works was commissioned in 2009. The plant has clinker capacity of 3.6 MTPA and cement capacity of 3.1 MTPA. The Unit has two captive power plants (CPP) CPP-I with 35 MW and CPP-II with 22.5 Not Mentioned More than 30 days ago
- Forum: Start a Discussion Join
-
SH Tech Services (Technical Cell) UltraTech Cement Limited - Wardha power plants (CPP) CPP-I with 35 MW and CPP-II with 2.50 MW capacity. The Unit has mines with reserve of 246.45 MT, a captive jetty, a desalination plant that can filter around 20 lakh litres of water Not Mentioned More than 30 days ago
Top locations