2 Turbine Field Operation Jobs in Wardha
-
PF TPP (Operation- Desk Engr) UltraTech Cement Limited - Wardha and safe plant operation through continuous interactions with field Operators as and when required. Visit to equipments and ensure the smooth functioning. To run the Boiler efficiently by optimizing Not Mentioned More than 30 days ago
-
PF TPP (Operation-Shift Ic) UltraTech Cement Limited - Wardha of excess air and minimized other losses and to optimized turbine operation parameter to minimize turbine heat rate. · Interact with cross function service department for maintenance activities to complete Not Mentioned More than 30 days ago
Top locations