2 Water Treatment Plant Design Jobs in Wardha
-
PF TPP (Operation-Shift Ic) UltraTech Cement Limited - Wardha and associated equipments. The lime stone & ash handling system is of pneumatic type. The water treatment system consists of R O & D M plant. Wast water will be treated in waste water treatment plant. Auxiliary Not Mentioned More than 30 days ago
-
PF TPP (Operation- Desk Engr) UltraTech Cement Limited - Wardha of Deaerator system etc. The design fuel for boiler is lignite. The approximate fuel consumption would be 900T/Day considering full load running of all two turbines. The fuel handling plant comprises of two Not Mentioned More than 30 days ago
Top locations