Power Plant O Jobs
New Delhi, Delhi, India
Ensure overall Operations and Maintenance of the Power Plants - Responsible for ensuring preventive maintenance, corrective maintenance, and major maintenance of plant system and equipment. - Manage
from: jobleads.co.in - 20 days ago
Godin International - Pune
.- Possess expertise in looking after Project and O & M of Power plant including HP & LP Boilers, Extraction cum condensing/Backpressure Turbines, DG Sets, Compressors, Cooling Towers, DM Plant/RO Plant
from: engineeristic.com - More than 30 days ago
SAEL Industries Ltd - Delhi
Position : Head - Operations and MaintenanceLocation : DelhiJob Description :- Ensure overall Operations and Maintenance of the Power Plants (Punjab, Haryana & Rajasthan)- Responsible for ensuring
from: engineeristic.com - More than 30 days ago
DCS Group - Goa Velha, IN
metals, infrastructure and other manufacturing sectors Job Overview Senior Instrumentation Engineer needed for a Metal Power Plant in Goa Velha, India. This is a full-time position with a minimum of 7 500000 - 600000 per year
from: expertia.ai - More than 30 days ago
Air Products - Kayamkulam, IN
of our plants. DIMENSIONS Plant Products (Approximate): H2: 16 t/h H2:CO: 14 t/h N2: 10,000 Nm3/h O2: 160 Nm3/h Power: 18 MW Number of Direct Reports (approximate): NIL. He shall be one of the 4 shift engineers
from: jobvertise.com - More than 30 days ago
Air Products - Kayamkulam, IN
. DIMENSIONS Plant Products (Approximate): H2: 16 t/h H2:CO: 14 t/h N2: 10,000 Nm3/h O2: 160 Nm3/h Power: 18 MW Number of Direct Reports (approximate): NIL. He shall be one of the 4 shift engineers who work
from: jobvertise.com - More than 30 days ago
Jaywin Electro Care - Tirupur/Tiruppur, Dharapuram
The successful candidate will be responsible for the operation and maintenance of solar energy systems. Not disclosed INR
from: naukri.com - 21 days ago
Air Products - Kayamkulam, IN
qualifications.Dimensions The Kochi plant is an INR 2000 Crore asset with an annual maintenance budget of approx INR 18 Crore and INR 7 Crore direct labour budget. Plant Products (Approximate): H2: 16 t/h H2:CO: 14 t/h N2
from: jobvertise.com - More than 30 days ago
Balaji Placement Service - Sonipat
Stabilizers, UPS, E.O.T Cranes, Forklifts, Hydra lifter, Conveyors, Battery trolley of 03-ton capacity, lab equipments. Chillers, RO Plant, Boiler, Compressors, high vacuum pumps, watering system, D.Gs up
from: Shine.com - 22 days ago
SEVEN CONSULTANCY - Tirupati (Andhra Pradesh)
Operator, Multicraft Operator (MCO), Operations and Maintenance Technician (O & M Technician), Station Operator, Plant Control Operator, Control Operator, Unit Operator, Senior Power Plant Operator
from: timesjobs.com - 10 days ago
Get email alerts for: Power Plant O Jobs
Sponsored Ads by Indeed