Water Treatment Plant Design Jobs in Wardha

1 to 2 of 2 vacancies

Sort by:  Date | Relevance

PF TPP (Operation-Shift Ic)  

UltraTech Cement Limited - Wardha

and associated equipments. The lime stone & ash handling system is of pneumatic type. The water treatment system consists of R O & D M plant. Wast water will be treated in waste water treatment plant. Auxiliary Not Mentioned

from: Monsterindia.com - More than 30 days ago

PF TPP (Operation- Desk Engr)  

UltraTech Cement Limited - Wardha

of Deaerator system etc. The design fuel for boiler is lignite. The approximate fuel consumption would be 900T/Day considering full load running of all two turbines. The fuel handling plant comprises of two Not Mentioned

from: Monsterindia.com - More than 30 days ago


Get email alerts for: Water Treatment Plant Design Jobs in Wardha

Top locations

Loading map...

Top locations near Wardha hiring now Water Treatment Plant Design Jobs:

Login through

JobisJob Tutorial

Visit our Help Centre

JobisJob Forum

Start a Discussion and Share your Insights.

Join

Share Options

Filter jobs by

Related sections

My recent searches
You have no recent searches at the moment.
Use our Job Search to find your new job.

Refine your search